Project Name Parking Lot Rehabilitation - Optimist Park
Funding $30,000 Tax Base
Timeline Mid-summer 2019

The asphalt parking lot surface at Optimist Park is in need of replacement. The current parking lot was constructed on an inadequate sub-base which lacks support. 

This project will be tendered as part of the City's asphalt resurfacing contract. The project will include removal of the current asphalt surface and installation of a minimal granular base topped with a layer of asphalt millings. This method of rehabilitation will be the most cost effective and will result in a longer lasting surface for users.

In addition to the parking lot, a short sidewalk in front of the Optimist Park office/garage building will be replaced. 

It is anticipated that this project will commence mid-summer 2019 and will be completed within a one week period. 

Map

phone icon Contact Us

Michael Fawthrop
Division Manager, Infrastructure
1225 Ontario Street, Box 877, Cornwall ON, K6H 5T9
Phone: 613-930-2787 ext. 2209
Fax: 613-932-8891