2022 07 14 22-T16 - Construction Notice - RECONSTRUCTION - York 2022 08 02 22-T16 - Disruption of Water Service 2022 08 11 22-T16 - Connection to Temporary Water Supply - York 2022 08 11 22-T16 - Water Service Disruption Notice - York Project ContactKyle McIntosh - Project Supervisor Phone : 613-362-5369 Location |
Background
The City will be reconstructing York Street between Fourth Street and Fifth Street in 2022.
The project includes rebuilding the road corridor (new pavement, curbs, sidewalks) and the installation of a new water, storm and sanitary sewer mains.
The project involves the separation of the existing combined sewer(s). Sewer separation involves replacing the existing sewer (which includes both storm and sanitary flows) and installing separate pipe networks for storm and sanitary flows. When combined sewers are separated, it reduces the flow of rainwater into the sewage system and the Wastewater Treatment Plant. This reduces basement flooding because there is less water flowing into the pipes that are connected to homes. It also reduces the possibility of water bypassing the Wastewater Treatment Plant and going into the St. Lawrence River.
Click to View the Open House Presentation Drawing
What to Expect During Construction
The project will involve the following work/stages:
1. Installation of a temporary watermain in the boulevard
2. Installation of temporary water services from the watermain to your outdoor taps.
3. Connecting residences to the temporary water supply.
4. Excavation.
5. Installation of new water, storm and sanitary sewer mains.
6. Removal of the existing watermain and combined sewer(s).
7. Installation of new water services and sewer laterals.
8. Grading and placing granular for a new road base.
9. Installation of new curbs and sidewalks.
10. Paving the new roadway (includes three layers of asphalt; two installed in 2022, and the third in 2023).
11. Restoration - includes new topsoil and sod and the repair of driveways and walkways.
Before the work starts, you will see utility companies (Enbridge, Bell, etc.) on your street. They are moving infrastructure they own to accommodate the work. If you have any service disruptions, please contact them directly.
There will be times when the water supply is disrupted. This is because the water has to be off in order to connect/disconnect residents to the temporary water supply so that the new watermain can be installed. The Contactor will send out notices twenty-four (24) hours in advance of the water being turned off.
Sometimes, unexpected events happen, like watermain breaks. When that happens, we cannot provide notice. We will work to restore your water service as quickly as possible.
There may be days where you don't see the Contractor on site in between the different stages of construction. This is a normal part of the process. The Contractor has many crews that do different types of work.
While the sidewalk and curbs are being formed and poured, you will not be able to park in your driveway. We will let you know ahead of time. Once the concrete hardens (usually after two or three days), you will be able to use your driveway again.
The Contractor may block your driveway during construction. They will do their best to keep these disruptions short. You will always be able to access your home and local businesses by foot. If you have any access needs, please contact the City.
If you have any questions or concerns, give us a call or e-mail us using the contact information on this page.
Construction Notices
Disruption of Water Service | |||||||||
Please be advised that due to construction, your water service will be disrupted on: August 11th 2022, at 8am. Please make any arrangements necessary to prepare for the disruption. We anticipate that your water service will be reinstated before 7AM to 12PM provided that there are no unforeseen circumstances. Occasionally, minor issues can occur after the water supply is reinstated.
We apologize for the inconvenience. If you have any questions or require further information, please reach out to the project team using the contact information provided below. Please note that work will only take place if weather permits. The water service disruption will be rescheduled for the following business day if the work is postponed as a result of inclement weather.
|
|||||||||
Connection to the Temporary Water Supply | |||||||||
Please be advised that the water distribution system will be shut-off for a short period of time to complete a switchover from the municipal water system to the temporary water supply. The disruption is expected to occur on: Thursday, August 11, 2022 from 12pm to 4pm. Throughout the duration of the project, a temporary water system will supply all properties with water. This system will connect to your house using a piping system connected to the outdoor tap. The Contractor will be going door to door once the municipal water supply is turned off. They will be connecting each property to the temporary water system. If you aren’t home while the conversion is taking place, please follow the instructions below:
The installation of the temporary water supply may result in minor water service issues. This may cause reduced pressure and increased water temperature. If your water is warm, run your taps until the water is cold. We apologize for the inconvenience. If you have any questions or require further information, please reach out to the project team using the contact information provided below. Part of this work may require a Licensed Plumber and/or a Contractor representative to enter your home to verify your temporary water connection location and/or you water shut off valve.
|
|||||||||
Disruption of Water Service | |||||||||
Please be advised that due to construction, your water service will be disrupted on: August 4th 2022, at 7:00am
Please make any arrangements necessary to prepare for the disruption. We anticipate that your water service will be reinstated before 12:00pm provided that there are no unforeseen circumstances. Occasionally, minor issues can occur after the water supply is reinstated. • If water shows discoloration, run the water until it clears. • If sputtering occurs, turn on every hot and cold faucet to remove air pockets from the water supply. • If flow at a faucet is less than usual, remove the screen from the faucet, remove any obstructions and reinstall it. We apologize for the inconvenience. If you have any questions or require further information, please reach out to the project team using the contact information provided below. Visit www.cornwall.ca/York/ to learn more about the project and subscribe to receive e-mail updates and digital notices at the various project milestones. Please note that work will only take place if weather permits. The water service disruption will be rescheduled for the following business day if the work is postponed as a result of inclement weather.
|
Construction News
Stay up to date on this project by subscribing to this page. Click the green "Subscribe to this Page" button below. When you subscribe, you'll receive email when notices and updates are added to the page.
Please be advised thatthe water distribution system will be shut-off for a short period of time to complete a switchover from the municipal water system to the temporary water supply. The disruption is expected to occur on:
Thursday, August 11, 2022 from 12PM to 4PM
Throughout the duration of the project, a temporary water system will supply all properties with water. This system will connect to your house using a piping system connected to the outdoor tap.
The Contractor will be going door to door once the municipal water supply is turned off. They will be connecting each property to the temporary water system. If you aren’t home while the conversion is taking place, please follow the instructions below:
· Shut off the interior water supply valve to your property. This is usually located in the basement towards the front of a house.
· Open the outdoor tap by turning the tap counterclockwise.
· Open the small valve situated on the “Y” adapter attached to the tap and point it towards your outside tap (refer to second photo).
· Open the cold water tap on a bathtub (or kitchen faucet) and allow the water to run for 5 - 10 minutes.
The installation of the temporary water supply may result in minor water service issues. This may cause reduced pressure and increased water temperature. If your water is warm, run your taps until the water is cold. We apologize for the inconvenience. If you have any questions or require further information, please reach out to the project team using the contact information provided below.
Part of this work may require a Licensed Plumber and/or a Contractor representative to enter your home to verify your temporary water connection location and/or you water shut off valve.
Louis. W Bray Construction Ltd. |
City of Cornwall |
City of Cornwall Dispatch (After Hours Contact – 24hr Availability) |
Darcy Dewar Site Superintendent
|
Kyle McIntosh Project Supervisor |
Municipal Works Office 1225 Ontario Street |
Cell: 613-551-2313
|
Cell: 613-362-5369 kmcintosh@cornwall.ca |
613-932-5354 ext. 0 |
Contact Us