Construction Notices

CGC Water Notice

Connection To Temporary Water - May 16 2022

Water Disruption notice - May 16 2022

Concrete Works Notice - July 12 2022

Water Disruption notice - July 20, 2022

Disconnection of Temporary Water Supply - July 20, 2022

Paving Notice - August 2, 2022

Project Contact

Kyle McIntosh - Project Supervisor

Phone : 613-362-5369

Email this contact

Location

2022 Third East Construction Sketch

Background

The City will be reconstructing Third Street East between Marlborough Street and Gloucester Street in 2022.

The project includes rebuilding the road corridor (new pavement, curbs, sidewalks) and the installation of a new water, storm and sanitary sewer mains.

The project involves the separation of the existing combined sewer(s). Sewer separation involves replacing the existing sewer (which includes both storm and sanitary flows) and installing separate pipe networks for storm and sanitary flows. When combined sewers are separated, it reduces the flow of rainwater into the sewage system and the Wastewater Treatment Plant. This reduces basement flooding because there is less water flowing into the pipes that are connected to homes. It also reduces the possibility of water bypassing the Wastewater Treatment Plant and going into the St. Lawrence River. 

What to Expect During Construction

The project will involve the following work/stages:

1. Installation of a temporary watermain in the boulevard

2. Installation of temporary water services from the watermain to your outdoor taps.

3. Connecting residences to the temporary water supply.

4. Excavation.

5. Installation of new water, storm and sanitary sewer mains.

6. Removal of the existing watermain and combined sewer(s).

7. Installation of new water services and sewer laterals.

8. Grading and placing granular for a new road base.

9. Installation of new curbs and sidewalks.

10.  Paving the new roadway – includes two layers of asphalt.

11. Restoration - includes new topsoil and sod and the repair of driveways and walkways.

Before the work starts, you will see utility companies (Enbridge, Bell, etc.) on your street. They are moving infrastructure they own to accommodate the work. If you have any service disruptions, please contact them directly.

There will be times when the water supply is disrupted. This is because the water has to be off in order to connect/disconnect residents to the temporary water supply so that the new watermain can be installed. The Contactor will send out notices twenty-four (24) hours in advance of the water being turned off.

Sometimes, unexpected events happen, like watermain breaks. When that happens, we cannot provide notice. We will work to restore your water service as quickly as possible.

There may be days where you don't see the Contractor on site in between the different stages of construction. This is a normal part of the process. The Contractor has many crews that do different types of work.

While the sidewalk and curbs are being formed and poured, you will not be able to park in your driveway. We will let you know ahead of time. Once the concrete hardens (usually after two or three days), you will be able to use your driveway again.

The Contractor may block your driveway during construction. They will do their best to keep these disruptions short. You will always be able to access your home and local businesses by foot. If you have any access needs, please contact the City.

If you have any questions or concerns, give us a call or e-mail us using the contact information on this page.

Construction Notices

 CGC Water Notice
 
 Connection To Temporary Water
 
 Water Disruption notice
 
 Concrete Works Notice
 
 Water Disruption notice
 
 Disconnection of Temporary Water Supply

Please be advised that due to construction, your water service will be disrupted on: Wednesday July 20, 2022 at 12:00pm.

 

Please make any arrangements necessary to prepare for the disruption. We anticipate that your water service will be reinstated before 5:00 PM, provided that there are no unforeseen circumstances.

Occasionally, minor issues can occur after the water supply is reinstated.

• If water shows discoloration, run the water until it clears.

• If sputtering occurs, turn on every hot and cold faucet to remove air pockets from the water supply.

• If flow at a faucet is less than usual, remove the screen from the faucet, remove any obstructions and reinstall it.

We apologize for the inconvenience. If you have any questions or require further information, please reach out to the project team using the contact information provided below. Visit www.cornwall.ca/first to learn more about the project and subscribe to receive email updates and digital notices at the various project milestones. Please note that work will only take place if weather permits.

 

The water service disruption will be rescheduled for the following business day if the work is postponed as a result of inclement weather.

 Paving Notice
Please be advised that paving will take place on THIRD STREET from GLOUCESTER STREET N to MARLBOROUGH STREET. Work is expected to begin:

Wednesday, August 3rd, 2022 at 7:00am.

Please make the necessary arrangements to have all your vehicles off the street prior to 7:00AM. Vehicles left on the street after 7:00am will be towed if they interfere with the work.

Please note that pedestrian access to residences will always be available. 

If you have any questions or require further information, please reach out to the project team using the contact information provided below.

Please note that work will only take place if weather permits. The paving will be rescheduled for the following business day if the work is postponed as a result of inclement weather.

 

Cornwall Gravel Company Ltd.

City of Cornwall

City of Cornwall Dispatch

(After Hours Contact – 24hr Availability)

Bryan Kelly

613-330-4614

Kyle McIntosh

Project Supervisor

Municipal Works Office

1225 Ontario Street

24hr Contact

613-932-6571

613-362-5369

KMcIntosh@cornwall.ca

613-932-5354 ext. 0


Construction News

Stay up to date on this project by subscribing to this page. Click the green "Subscribe to this Page" button below. When you subscribe, you'll receive email when notices and updates are added to the page.


Subscribe to this Page

phone icon Contact Us