In 2021, the City will be replacing the cross culvert on Second Street East, which is located approximately 50m west of Billington Drive.

The project involves removing the existing 900mm corrugated steel pipe (CSP) culvert and replacing it with a new polymer coated CSP culvert. 

What to Expect During Construction

The project will involve the following work/stages:

  1. Setting up by-pass pumps and sediment and erosion control measures (as required). These measures protect fish any fish and wildlife that are in the area.
  2. Excavation and removal of the existing culvert.
  3. Installation of the new CSP culvert.
  4. Reinstatement of the roadway (asphalt paving).
  5. Restoration - includes new topsoil and sod and the repair of driveways and walkways.

Before the work starts, you may see utility companies (Enbridge, Bell, etc.) on your street. They are moving infrastructure they own to accommodate the work. If you have any service disruptions, please contact them directly.

There may be days where you don't see the Contractor on site in between the different stages of construction. This is a normal part of the process. The Contractor has many crews that do different types of work.

If you have any questions or concerns, give us a call or e-mail us using the contact information on this page.